Poland’s Gaz-System wraps up Swinoujscie LNG terminal expansion
Regas
July 2, 2025

Poland’s Gaz-System wraps up Swinoujscie LNG terminal expansion

The expanded terminal now has total regasification capacity of 8.3 bcm per year, available since January 2025. The expansion included the tird tank and additional jetty.

Poland’s Gaz-System wraps up Swinoujscie LNG terminal expansion

Share this on your socials

Logo du réseau professionnel LinkedInIcône bleu représentant un e-mail

Related posts

`