
Contracts
July 2, 2025
Woodside to supply 0.5 MTPA LNG to Kogas
The SPA signed by Woodside and KOGAS should start in 2026 for a period of 10.5 years on a DES basis.

The SPA signed by Woodside and KOGAS should start in 2026 for a period of 10.5 years on a DES basis.