
Regas
September 21, 2026
Fluxys: Dunkirk LNG sendout reduced due to strike
Dunkirk LNG reduced sendout to the French grid on September 15 due to strike action in France’s electricity and gas sector. Terminal delivery capacity was cut to 4 GWh/day for the gas day, while Fluxys said safety remained fully ensured. Dunkirk LNG has 13 bcm/year of regasification capacity, covering over 25% of French and Belgian annual gas consumption.


